The Selangor state government is currently in the process of identifying a location for the construction of Malaysia’s first nuclear power plant, with development targeted for completion by 2030. Selangor Chief Minister (Menteri Besar) Datuk Seri Amirudin Shari stated that the coastal stretch between Kuala Langat and Sabak Bernam is being considered, as the plant will require a water supply for cooling systems and operational needs.
He added that the Selangor Nuclear Council—comprising academics and industry players—is drafting a roadmap to prepare the state for the development of a nuclear industry. Furthermore, Selangor has already sent three students to China to pursue studies in nuclear engineering at the Harbin Institute of Technology and Tsinghua University. An additional 22 students are set to be sent to the same institutions, with full funding provided up to the doctoral (PhD) level.
Malaysia has been exploring the use of nuclear energy since 2023. At that time, Minister of Economy Rafizi Ramli remarked that Malaysia cannot afford to be overly selective regarding the adoption of nuclear energy, provided it meets the nation’s demands and requirements. He further noted that Malaysia does not have the luxury of turning away potential solutions, while also acknowledging the potential of small modular nuclear reactors.
Minister of Natural Resources, Environment and Climate Change Nik Nazmi also indicated that the government is considering nuclear power to help meet the nation’s net-zero carbon emissions targets. A shift toward more sustainable energy sources is necessary, driven by a surge in electricity demand from data centers and the volatility in fossil fuel prices observed in recent years.
While nuclear energy has carried a negative reputation since the disasters at Chernobyl and Fukushima, more advanced technologies—such as China’s thorium-based reactors—are considered safer; they can even be constructed in desert regions, as they do not require extensive water-based cooling systems.

